Skip to main content
Plyrium

Founding Chicago-market sample · verified July 13, 2026 at 8:34 a.m. CT

How a market-specific Radar report is structured

This refresh found no publicly verifiable direct HVAC, BAS, controls, boiler, chiller, ventilation, TAB, or conventional mechanical-service opportunity. The four records below are adjacent process or energy work and are labeled that way rather than padded into a direct-opportunity list. Always recheck the complete official package before acting.

Adjacent opportunityConfidence: High

MWRD 26-915-11: H2S removal-vessel media

Metropolitan Water Reclamation District of Greater Chicago

Furnish, deliver, remove, dispose of, and replace hydrogen-sulfide removal media in two vessels at the Stickney Water Reclamation Plant.

Location
Stickney Water Reclamation Plant, Stickney, Illinois
Published deadline
July 14, 2026 at 11:00 a.m. Central Time

Why it may matter

Potential fit for industrial odor-control, vessel-service, or process-mechanical specialists.

Limitations

Not conventional building HVAC. Site inspection is strongly urged but not stated as mandatory. Addenda require portal access and were not publicly verified.

Source retrieved July 13, 2026 · Last verified July 13, 2026 at 8:34 a.m. CTOfficial source
Adjacent opportunityConfidence: High

MWRD 22-602-21: Underground storage tank improvements

Metropolitan Water Reclamation District of Greater Chicago

Upgrade 11 underground storage tanks, dispensing systems, monitoring, alarms, emergency shutoffs, and related equipment at multiple District locations.

Location
Various MWRD locations, Greater Chicago area
Published deadline
July 14, 2026 at 11:00 a.m. Central Time

Why it may matter

Potential fit for fuel-system and process-mechanical contractors.

Limitations

Not HVAC. No organized pre-bid event was identified in the inspected invitation. Addenda require portal access and were not publicly verified.

Source retrieved July 13, 2026 · Last verified July 13, 2026 at 8:34 a.m. CTOfficial source
Adjacent opportunityConfidence: High

MWRD 26-RFP-01: Energy curtailment services

Metropolitan Water Reclamation District of Greater Chicago

Demand-response and PJM energy-curtailment strategy and administration for District facilities.

Location
MWRD facilities, Greater Chicago area
Published deadline
July 24, 2026 at 11:00 a.m. Central Time

Why it may matter

Potential fit for demand-response and energy-management firms.

Limitations

Not HVAC construction or BAS installation. Addenda require portal access and were not publicly verified. One public Q&A response was posted July 13.

Source retrieved July 13, 2026 · Last verified July 13, 2026 at 8:34 a.m. CTOfficial source
Adjacent opportunityConfidence: High

MWRD 26-634-11: Cathodic-protection systems

Metropolitan Water Reclamation District of Greater Chicago

Inspection and repair of corrosion-control systems for buried or submerged metallic infrastructure.

Location
Various MWRD facilities
Published deadline
July 14, 2026 at 11:00 a.m. Central Time

Why it may matter

Possible fit only for corrosion-control specialists or mechanical contractors with cathodic-protection capability.

Limitations

Weak HVAC fit. Site inspection is strongly urged but not stated as mandatory. Addenda require portal access and were not publicly verified.

Source retrieved July 13, 2026 · Last verified July 13, 2026 at 8:34 a.m. CTOfficial source

Want this filtered for your team?

The $99 founding pilot includes four source-linked weekly reports over 30 days, with no automatic renewal.

Start the pilot
Founding Chicago Radar sample